⎝⎛斗牛平台⎞⎠

Welcome to Jinwu Hollow Floor Network

信息咨询 Company Information Consulting

Jinwu hollow floor is a brand of Wuhan Jinwu New Building Material Co., Ltd. It is a professional manufacturer of hollow floor. The company was founded in 2009 and has 9 years of hollow floor processing experience. The company's products include: thin-walled square boxes, plaster mold boxes, honeycomb cores, thin-walled pipes, building mold shells, etc

Wuhan Jinwu New Building Material Co., Ltd.

Business Contact: Manager

Phone: 13367256165

Contact QQ: 281509502

E-mail: babsan@163.com

Company address: Next to the original fertilizer plant in Huangpi District, Wuhan City, Hubei Province

Force principle of multi-ribbed floor

进武空心楼盖提供密肋楼盖的受力原理,从三个方面分析,密肋楼盖构架设施,密肋楼盖的高度,密肋楼盖的设计配筋等,并配上截面图给大家参考. Description: Jinwu hollow floor provides the force principle of multi-floor floor, analysis from three aspects, multi-floor floor structure, multi-floor floor height, multi-floor floor design reinforcement, etc. The cross section is for your reference.

There are three main factors affecting the strength of the multi-ribbed floor

There are multi-ribbed floor frame facilities, height of multi-ribbed floor, and design reinforcement of multi-ribbed floor.The following are the details.

1: The multi-ribbed floor is a beam system.The ductility and integrity of the multi-ribbed floor is reflected by appropriate structural measures at the column caps, because the multi-ribbed floor is compared with a solid floor or a beamless building with a hollow slab. The seismic performance of the cover is superior, and the multi-ribbed floor cover will be used more widely in the future.

Forced construction of multi-ribbed floor

2: In general, the structural height of the beamless floor of the solid slab is smaller than the structural height of the ribbed slab.This results in the weakness and seismic performance of the beamless slab of the solid slab. It also has better earthquake resistance.

Forced surface of pre-buried dense ribbed floor

3: The space stress system of the multi-ribbed floor is mainly divided into wide flat beams between columns and densely distributed rib beams.If the effect of force transmission is better, it is necessary to match the structure and seismic requirements of the beam with steel bars. .

作者:进武空心楼盖 浏览量:652次 Time: 2018-10-23 18:27 Author: Wu into the hollow floor Viewed: 652 times

Article URL: http://sayvow.com/zixun/64.html
七乐彩 真人游戏平台注册 欢乐拼三张 皇冠体育app